Wednesday, April 11, 2018

Week 12: Presentation #2 on 4/11 (4/12/2018 - 4/18/2018)

The presentation was completed at Spartan Superway Design Center on April 11th, Wednesday. The hand calculation of CFD results and the maximum wind speed may need to be altered per the feedback from Dr. Furman. Batteries, charge controllers, parallel y-connectors, extension cables, and MC3 to MC4 converter have been purchased. Wires, gutter, and wooden fake panels will be ordered as soon as possible.