Week 11: Manufacturing and Finishing up the BOM (4/5/2018 - 4/11/2018)
This week, the solar team focused on manufacturing some of the main structural components for the solar panels. Galvanized Steel Sheet metals in 16Ga and 18Ga were tested and 16Ga was selected due to its rigidity. The sheet metals were purchased at Acosta Sheet Metal Manufacturing. Bill of materials include all the details such as total cost including tax and discount as well as the dates of purchase. The presentation was prepared to incorporate all the progress the team has made since the spring break.