The above image is the current status of all the sub-team's assemblies, all compiled into one solid works file. Wind loading was considered in the assembly of the solar array. The team is currently looking into wiring and connection issues that may arise. The team also needs to figure out the gutter helmet implementation, although the trussing and curve components were primarily considered for the design shown.
No comments:
Post a Comment