Monday, January 29, 2018

2nd Semester, Week 1 (1/25/2018 - 1/31/2018)

The team is currently working on improving the design from last semester.  There has been some talk among the faculty of changing the track length from 9 meters to 3 meters, as the current budget may not be enough to support the materials and labor required for a 9 meter track.  It is all mostly speculation at this point.  The team is preparing for a lightning talk on this upcoming Wednesday, and we're all trying to remember what the desired content of a lightning talk is, as the last one was 5 months ago.

No comments:

Post a Comment